GWR Long Rock Depot Penzance
Heavy-duty flow applied flooring for the new £20m sleeper train depot in Penzance
- Location
- Penzance
- Project Size
- 4,000m²
- Duration
- 3 weeks
- Sector
- Transport
- Products
- Flowcrete Peran STB
Project Overview
As part of a scheme to improve the sleeper train service between Cornwall and London, a new £20 million depot was built in Penzance alongside the redevelopment of the existing facility.
Selected through a competitive process, TPS360 played an integral role in each phase of the project, redeveloping and enhancing the depot within tight timescales and budget restrictions.
On Film
Project Video
Scope of Works
The Specification
-
01
Flooring System
Flowcrete Peran STB heavy-duty flow applied flooring
-
02
Coverage
4,000m² across the new and existing depot
-
03
Slip Resistance
Good slip resistance for depot operations
-
04
Performance
Chemical, temperature and wear resistance
-
05
Maintenance
Easy to clean with low maintenance costs
On Site
The Challenges
The works covered every phase of a new build depot and the redevelopment of the existing facility, delivered within tight timescales and budget restrictions.
- Multiple project phases
- New build and existing depot
- Tight timescales
- Budget restrictions
Meet Our Specialist
Gavin Ashcroft
Sales Director (South Wales & West)
Gavin Ashcroft, our Sales Director for South Wales and West, leads the resin flooring team, bringing vast experience in both resin flooring and hygienic solutions. Gavin has made a huge contribution through his food and beverage industry knowledge and expertise, working with leading food production plants throughout the UK.