Project Overview
TPS360 refurbished appliance bay floors across four operational fire stations, installing a 6mm Resdev Pumadur HF, FeRFA Type 8 heavy-duty polyurethane resin screed suited to appliance traffic and regular washing.
The work went beyond the surface finish, with floor removal, pit infilling and replacement screeds where required. Levels were adjusted around thresholds and drainage before resin installation. Safe firefighter access was maintained while the stations continued responding to emergency calls.
On Film
Project Video
Scope of Works
The Specification
-
01
Strip-Out
Removal of existing tiles and screeds
-
02
Preparation
Mechanical substrate preparation
-
03
Pit Infill
Infilling redundant inspection pits
-
04
Screeds
Replacement screeds and drainage falls
-
05
Levels
Adjustment of floor levels at thresholds
-
06
Resin Screed
6mm Resdev Pumadur HF, FeRFA Type 8
-
07
Detailing
Resin coving and step details
-
08
Joints
Reinstatement of floor joints
On Site
The Challenges
The stations remained operational, with appliances parked outside and safe firefighter access maintained. Dust, plant and material movements were managed around emergency calls.
Floor removal exposed differing substrate conditions, requiring changes to screed depths and levels around thresholds and drainage. Accurate levelling and sufficient curing were essential before heavy appliances could return.
- Four stations kept operational throughout
- Safe firefighter access maintained
- Works planned around emergency calls
- Differing substrate conditions under old floors
- Curing time before heavy appliances returned
The important work started beneath the resin. We had to get the base sound and the levels right at thresholds and drains before we could think about the finish. Those details matter when you're putting heavy appliances back into the bays and washing the floors regularly.
Meet Our Specialist
Gavin Ashcroft
Sales Director (South Wales & West)
Gavin Ashcroft, our Sales Director for South Wales and West, leads the resin flooring team, bringing vast experience in both resin flooring and hygienic solutions. Gavin has made a huge contribution through his food and beverage industry knowledge and expertise, working with leading food production plants throughout the UK.