Heavy duty polyurethane screed ahead of new aircraft rescue and firefighting vehicles

Project Size
450m²
Duration
2 weeks
Sector
Law, Order and Blue Light
Products
Remmers Crete HF

Project Overview

With new Aircraft Rescue and Firefighting (ARFF) vehicles due for delivery, TPS360 was instructed by the MOD to supply and install a heavy duty polyurethane screed to the appliance bays and workshops.

The 450m² FeRFA Type 8 Remmers Crete HF system gives a high order of durability with resistance to abrasion, impact and chemical attack, and is stable to steam cleaning at 9mm.

Scope of Works

The Specification

  1. 01

    Preparation

    Husqvarna planetary grinders for a clean profiled surface

  2. 02

    Edge Rebates

    20mm by 8mm rebates cut 150mm from and parallel to the walls

  3. 03

    Screed

    Remmers Crete HF heavy duty polyurethane at 9mm

  4. 04

    Aftercare

    Rotary scrubber drier with a mildly alkaline detergent

On Site

The Challenges

The floor had to be ready for the arrival of new ARFF vehicles, with a screed able to take heavy duty traffic and plant.

To keep the system fully bonded to the sub-floor, edge rebates were cut along every wall before the screed went down.

  • Ready for new ARFF vehicle delivery
  • Heavy duty vehicle and plant traffic
  • Edge rebates for a fully bonded system
Mark Jackson

Meet Our Specialist

Mark Jackson

Sales Director (Central, North & East)

Mark Jackson, our Sales Director, has over 30 years experience in polished concrete gained at HTC, SIG, PPC and most recently in the last 3 years, at TPS360.

Let's Talk About Your Next Project

Tell us about your site and your programme and we'll come back to you with the right approach.