Transport for Wales (TfW) Taffs Well Metro Depot
Resin Flooring Transport

Transport for Wales (TfW) Taffs Well Metro Depot

Specialist resin flooring for the £100m South Wales Metro depot

Project Ref C8907

Main Contractor
Korbuild
Location
Cardiff
Project Size
501m²
Start Date
April 2024
Duration
7 months (phased)
Sector
Transport
Products
Sika MultiDur EB-12 and Flowcrete Mondéco Classic

Project Overview

The £100 million Taffs Well Depot is a key part of the South Wales Metro, providing a purpose-built facility for the maintenance and stabling of Transport for Wales’ new tram-train fleet.

Working with Korbuild, TPS360 delivered specialist resin flooring across the development, including Flowcrete Mondéco Classic decorative terrazzo to the stairwells and Sika MultiDur EB-12 epoxy flooring to mezzanine and warehouse areas. The works also included concrete repairs, stair nosings and slip-resistance testing, providing durable finishes suited to the different areas of the facility.

Scope of Works

The Specification

  1. 01

    Decorative Terrazzo

    120m² of Flowcrete Mondéco Classic to the stairwells

  2. 02

    Epoxy Flooring

    381m² of Sika MultiDur EB-12 slip-resistant epoxy to mezzanine and warehouse areas

  3. 03

    Concrete Repairs

    Repairs and substrate preparation

  4. 04

    Stair Nosings

    Supplied and installed with concealed fixings

  5. 05

    Terrazzo Finishing

    Grinding, polishing and finishing of the decorative terrazzo

  6. 06

    Slip Testing

    Slip-resistance testing

On Site

The Challenges

The project involved installing different flooring systems across stairwells, mezzanine and warehouse areas, each requiring specific preparation and finishing.

Additional concrete repairs, programme delays and return visits required careful coordination, while temporary power was needed to complete the mezzanine and warehouse works.

  • Different systems across stairwells, mezzanine and warehouse
  • Additional concrete repairs
  • Programme delays and return visits
  • Temporary power for the mezzanine and warehouse works

It's good to have been involved in a project of this significance for South Wales. The team put a lot of work into getting everything right, and it's great to see the depot now open and playing such an important part in the region's transport network.

Gavin Ashcroft Sales Director, TPS360
Gavin Ashcroft

Meet Our Specialist

Gavin Ashcroft

Sales Director (South Wales & West)

Gavin Ashcroft, our Sales Director for South Wales and West, leads the resin flooring team, bringing vast experience in both resin flooring and hygienic solutions. Gavin has made a huge contribution through his food and beverage industry knowledge and expertise, working with leading food production plants throughout the UK.

Let's Talk About Your Next Project

Tell us about your site and your programme and we'll come back to you with the right approach.