FOOD & BEVERAGE

Heavy Duty Flow Applied – FeRFA Type 5

Location

London

Products

Remmers Epoxy SL

Size

1480m²

Duration

10 days

From its roastery plant in London, our client supplies the coffee to all its coffee houses worldwide.

TPS360 were instructed to install a high-quality flooring to cover an area measuring 1,480m².  The flooring system needed to be durable, sustainable and with thermal capabilities of up to 70°C.

We prepared the existing substrate using our HTC 950Rx planetary grinding machine and edge grinder; removing contaminants and weakness to give a clean, sound, load-bearing surface.

The prepared concrete received a roller applied priming coat of Epoxy ST100. This primed surface was then coated with Remmers Epoxyflex PH coating as a flow system to the desired thickness.

The addition of Accelerator PH was used to reduce walk on time to 4 hours.

System properties include:

  • Flexibility
  • High sheen
  • Durability
  • Smooth and seamless finish
  • Hygienic
  • Easy to clean
  • Good chemical resistance
  • Wide colour range
  • Fast cure is possible

Meet our specialist

Lee Jones

Lee Jones who joined us in 2020 as Contracts Manager, is a key player in our Hygienic Solutions team. Lee has extensive food and beverage industry experience; portal steel frame building construction, cold stores, external cladding and internal fitouts and demolition works.